Dephy wrote:
Hello, Experts,
I exactly know that Qualification of new welding procedure or Requalification of existing welding procedure should confirm to the latest revision of ASME section Ⅸ according to QW-100.3. while for just updating an old WPS or preparing a new WPS without requalification,Is that WPS required to follow the latest version or just refer to the same version with the supporting PQR?
In all Sect. IX Editions and namely in the last one,
ASME IX Ed.2010 Add '11: QW-100.3 is self explanatory:
"Welding Procedure Specifications, Procedure
Qualification Records, and Welder/Welding Operator
Performance Qualification made in accordance with the
requirements of the 1962 Edition or any later Edition of
Section IX may be used in any construction built to the
ASME Boiler and Pressure Vessel Code or the ASME B31
Code for Pressure Piping."
Mauro