|
|
| Topics |
Author |
Replies |
Views |
Last post |
 |
Saddle on Top Position (Vessel Hanged to Structure/Platform)
|
faizol |
0 |
160 |
Sun Dec 05, 2010 12:43 pm
faizol
|
 |
Fired Steam Boiler (Sect.VIII Div.1) vs Sect.I
|
Gonzaga |
5 |
349 |
Sat Dec 04, 2010 4:18 pm
Gonzaga
|
 |
PWHT of Stainless Steel
|
deckyantoni |
0 |
310 |
Sat Dec 04, 2010 6:56 am
deckyantoni
|
 |
Governing thickness for PWHT
|
jitesh_vk |
3 |
725 |
Thu Dec 02, 2010 12:25 am
Gonzaga
|
 |
SB-171 Table 2 thickness tolerance.
|
mikeqc1 |
1 |
158 |
Tue Nov 30, 2010 6:19 pm
Javed Nasir
|
 |
heat treatment for cladded plates
|
makrands9 |
1 |
180 |
Tue Nov 30, 2010 4:07 pm
Javed Nasir
|
 |
Appendix 1-10 of ASME Section VIII Div (1)
|
Ikram |
4 |
538 |
Mon Nov 29, 2010 2:28 pm
Javed Nasir
|
 |
Steam Tracing system - Re-design
|
jitesh_vk |
1 |
156 |
Sun Nov 28, 2010 10:43 pm
Gonzaga
|
 |
Ellipsoidal Closure
|
virendra |
6 |
349 |
Mon Nov 22, 2010 6:28 pm
mbc.engg
|
 |
Impacts SA-333
|
mikeqc1 |
4 |
226 |
Sat Nov 20, 2010 1:02 am
mikeqc1
|
 |
Female Authorized Inspector; A little intersting question
|
Javed Nasir |
3 |
372 |
Sat Nov 20, 2010 12:41 am
sooeey2u
|
 |
Difference between U and UM
|
Mac |
2 |
330 |
Thu Nov 18, 2010 7:52 pm
Mac
|
 |
Integral type flange fig. 2-4(7), hub stress factors
|
pastyl |
0 |
209 |
Wed Nov 17, 2010 10:20 pm
pastyl
|
 |
Nameplate stamping UT
|
Gonzaga |
5 |
787 |
Wed Nov 17, 2010 12:43 am
sooeey2u
|
 |
Whether Metric Bolting or inch Bolting for SEC VIII DIV 1
|
vishaltailor |
4 |
249 |
Tue Nov 16, 2010 4:53 pm
tom @ codeware
|
 |
What is the normal way to fix a shipped vessel?
[ Go to page: 1, 2 ]
|
Jeff |
21 |
414 |
Tue Nov 16, 2010 11:04 am
akonrad
|
 |
Integrity of vessel with additional weld joints
|
Inspectengr |
1 |
147 |
Mon Nov 15, 2010 2:30 pm
niraj_kuwait
|
 |
Pipe elbow calculation
|
Malyl |
4 |
438 |
Thu Nov 11, 2010 3:50 am
Javed Nasir
|
 |
How to calculate the thin tubesheet?
|
gd_juan |
1 |
187 |
Thu Nov 11, 2010 2:22 am
gd_juan
|
 |
SPWHT
|
makrands9 |
6 |
376 |
Wed Nov 10, 2010 4:36 am
makrands9
|
 |
Hydrogen Service
|
Prashant Bhosale |
1 |
388 |
Tue Nov 09, 2010 12:03 am
shmulik
|
 |
CLAC. PER UG45
|
petty |
3 |
331 |
Mon Nov 08, 2010 9:36 am
Javed Nasir
|
 |
is dynamic load included in MAWP
|
fred.wang |
2 |
195 |
Mon Nov 08, 2010 5:37 am
mbc.engg
|
 |
Please help me out with this question, this is urgent
|
Jeff |
8 |
253 |
Thu Nov 04, 2010 8:42 pm
Jeff
|
 |
SA 312 and SA 376 pipe
|
rinosa |
1 |
263 |
Thu Nov 04, 2010 6:50 am
vishaltailor
|
 |
calculations for mawp of girth flange
|
kasi |
2 |
219 |
Tue Nov 02, 2010 4:40 pm
kasi
|
 |
UG-99E FOR JACKETTED VESSEL
|
kasi |
3 |
181 |
Fri Oct 29, 2010 11:19 am
rajae312
|
 |
VESSEL DESIGN FOR LATHAL SERVICE
|
HASANSAIF |
11 |
2532 |
Fri Oct 29, 2010 4:59 am
sanjeev_shukla70
|
 |
Moved: Pneumatic Test Preesure as pe ASME B31.1 (137.5.5)
|
Mac |
2 |
356 |
Thu Oct 28, 2010 6:27 pm
Dr. Koelbl
|
 |
Steel 2101 and steel 2205
|
Jeff |
4 |
414 |
Thu Oct 28, 2010 4:11 pm
akonrad
|
 |
IGC testing for SA 965 Gr F 304L & SA 182 Gr F 304L ?
|
makrands9 |
1 |
400 |
Thu Oct 28, 2010 4:01 pm
Javed Nasir
|
 |
Welding of SA 312 TP 304L & SA 516 GR 70
|
makrands9 |
1 |
283 |
Sun Oct 24, 2010 10:03 pm
Juergen Fleischfresser
|
 |
Weld overlay on vessel/ piping flanges
|
sanjeev_shukla70 |
7 |
1520 |
Sat Oct 23, 2010 7:38 pm
makrands9
|
 |
Pressure vessel design guide
|
ahmad5959 |
3 |
566 |
Sat Oct 23, 2010 7:29 am
ahmad5959
|
 |
clarification needed for using stiffening rings
|
kasi |
2 |
231 |
Fri Oct 22, 2010 1:50 am
kasi
|
 |
Welding of 316 vessel
|
sooeey2u |
0 |
166 |
Wed Oct 20, 2010 10:05 pm
sooeey2u
|
 |
O ring gasket dimensions
|
makrands9 |
0 |
158 |
Mon Oct 18, 2010 8:04 pm
makrands9
|
 |
heat treatment
|
john |
1 |
199 |
Mon Oct 18, 2010 3:44 pm
Jackal
|
 |
Is hydrotest required after RF pad welding?
|
d_g_mhatre |
6 |
757 |
Sat Oct 16, 2010 7:50 am
Gonzaga
|
 |
necessity of re-hydrotest
|
yash |
4 |
241 |
Thu Oct 14, 2010 11:06 pm
sooeey2u
|
 |
Hardness value of tube to tubesheet joint
|
Ikram |
1 |
252 |
Sun Oct 10, 2010 10:47 pm
Gonzaga
|
 |
ASME name plate
|
john |
8 |
480 |
Sun Oct 03, 2010 10:21 pm
Gonzaga
|
 |
SA-240/316 plate MTR
|
Gonzaga |
1 |
221 |
Thu Sep 30, 2010 4:59 pm
Jackal
|
 |
POST WELD HEAT TREATMENT for non pressure attachment
|
ravagnangroup |
1 |
135 |
Wed Sep 29, 2010 9:54 pm
Gonzaga
|
 |
Nominal thickness and PWHT UW-40 and UCS-56
|
msollerer |
4 |
606 |
Sun Sep 26, 2010 12:38 pm
msollerer
|
 |
Extent of RT & Joint Eficiency UW11
|
Mac |
3 |
469 |
Mon Sep 20, 2010 8:08 pm
Mac
|
 |
Opening cut in Circseam before doing X-Ray-needs resolution
|
Mac |
3 |
577 |
Sun Sep 19, 2010 9:29 am
Dr. Koelbl
|
 |
welding joint coeffient
|
petty |
7 |
526 |
Fri Sep 17, 2010 10:07 pm
Gonzaga
|
 |
Saddle calcualtion for Transportation
|
Ali Ahmed |
1 |
228 |
Mon Sep 13, 2010 2:31 pm
amol
|
 |
Orientation and Elevation of Nozzles
|
deep79pk |
2 |
396 |
Wed Sep 08, 2010 12:40 pm
Eric.chen
|
|
|