 Post subject: Hwo to comprehend the QW-407.2 PWHT OF "ASME BPVC SECTION IX
PostPosted: Wed Dec 09, 2009 6:17 am 
Offline

Joined: Wed Dec 09, 2009 6:10 am
Posts: 1
"The procedure qualification test shall be subjected to PWHT essentially equivalent to that encountered in the fabrication of production welds , including at least 80%of the aggregate times at temperature(s). The PWHT total time(s) at temperature(s) may be applied in one heating cycle."

There are two comprehension,Which one is correct?or other comprehension?
1.This paragraph is only used to guide the assessment process required PWHT, the heat treatment procedure qualification is only assessed in the heat-treatment time calculation method (formula, such as in Table NB-4622.1-1, ... ...) .
2. (For example) process evaluation, used the base metal P-NO.1, wall thickness 1in, PWHT with 1hr, after passing the assessment, which covers the range of 3 / 16 ~ 1.25in, but the heat times are 1hr.
Thank you for your help!


Top
 Profile  
 
 Post subject: Re: Hwo to comprehend the QW-407.2 PWHT OF "ASME BPVC SECTION IX
PostPosted: Fri Jan 08, 2010 11:42 pm 
Offline
----------------
----------------
User avatar

Joined: Sat Dec 15, 2001 1:00 am
Posts: 421
tt_521 wrote:
"The procedure qualification test shall be subjected to PWHT essentially equivalent to that encountered in the fabrication of production welds , including at least 80%of the aggregate times at temperature(s). The PWHT total time(s) at temperature(s) may be applied in one heating cycle."

There are two comprehension,Which one is correct?or other comprehension?
1.This paragraph is only used to guide the assessment process required PWHT, the heat treatment procedure qualification is only assessed in the heat-treatment time calculation method (formula, such as in Table NB-4622.1-1, ... ...) .
2. (For example) process evaluation, used the base metal P-NO.1, wall thickness 1in, PWHT with 1hr, after passing the assessment, which covers the range of 3 / 16 ~ 1.25in, but the heat times are 1hr.
Thank you for your help!


The paragraph quoted is QW-407.2. It is a supplementary essential variable and it is to be used only when impact testing is required by the Code of construction. Otherwise FORGET IT.
Mauro


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO