Joined: Sat Dec 01, 2001 1:00 am Posts: 676 Location: Essen, Germany
|
|
Basically the correct sequence is
Prepare the manual approve it get it accepted by ANIS distribute it training and indoctrination design qualification of vendors purchasing, etc.
If during the preparation for the Survey a PO is issued to a vendor not qualified, it is a violation of the Code and QA manual. If fabrication is started prior to ANI acceptance of traveler, I recommend to cancel the Survey. It would be a waste of time and money.
DK
|
|