I need to know if the P4 form required to be filled for all field weld in the boiler (for A stamp holder) befor signing P3 form or not??


Top
 Profile  
 
 Post subject: Re: P4 form
PostPosted: Fri Dec 24, 2010 2:14 pm 
Offline
----------------
----------------
User avatar

Joined: Sat Dec 01, 2001 1:00 am
Posts: 869
Location: Essen, Germany
AHMED,

this depends on the type of boiler, and on the scope of work split up to the A, S, and maybe PP stampholders involved.

Your AI should be able to assist in the solution. If he does not know, he should contact his AIS for advise.

DK


Top
 Profile  
 
 Post subject: Re: P4 form
PostPosted: Fri Dec 24, 2010 2:36 pm 
Offline

Joined: Fri Dec 24, 2010 1:48 pm
Posts: 3
Dear Dr. Koelbl
we have the scope of assembly of power boiler"PW ASME Section I" as (A stamp holder)only and we have an engineering contractor is resposible for Design,Fabrication and Preparing P4 form for fabicated items are we need to making P4 form for field assembly Such as(connection between water wall by field welding)inspit of we didn't making any fabrication of these items but just assembly and we didn't have S Stamp
thanks


Top
 Profile  
 
 Post subject: Re: P4 form
PostPosted: Sat Dec 25, 2010 9:31 am 
Offline
----------------
----------------
User avatar

Joined: Sat Dec 01, 2001 1:00 am
Posts: 869
Location: Essen, Germany
Ahmed,

Your scope of field installation covers welding on site, but no shop fabrication, no design, and no S-stamp responsibility. That is clear.
You wrote about the Engineering contractor. They shall issue P-3 or P-3A Certificate.
Are you the only Assembler on site, or is the Engineering contractor also performing some assembly?
Who is responsible for the hydrotest?

DK


Top
 Profile  
 
 Post subject: Re: P4 form
PostPosted: Sat Dec 25, 2010 10:23 am 
Offline

Joined: Fri Dec 24, 2010 1:48 pm
Posts: 3
Dr. Koelbl,


we are only Assembler on site and the Engineering contractor not performing any assembly on site
we are responsible for the hydrotest on the site

thanks


Top
 Profile  
 
 Post subject: Re: P4 form
PostPosted: Mon Dec 27, 2010 3:20 pm 
Offline
----------------
----------------

Joined: Tue Dec 01, 2009 1:55 pm
Posts: 270
Location: DESCON Engineering Limited, Pakistan
Ahmed,
It refers to Edition 2010 of ASME Section I.
As per PG-112.2.6, you will record your code activities on form P-4A if you are only assembler and you are not manufacturer of the completed boiler, for this you must have at least one welded or brazed joint in the piping otherwise you will fill P-4B.
Now, your P-4 shall support Engineering Contractor's P-3A.
Please see also A-357 (Non-Mandatory Appendix of Section I for the guide lines to required data report forms and how to distribute and who has to distribute(?
Further comments from any other member shall enhance our knowledge.

_________________
Thanks & Regards,
Nasir
Welding Engineer
DESCON Engineering Limited.
Lahore, Pakistan.
Mobile # 0092-336-4145402


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO