Our client is insisting on the PWHT of the Tube to tubesheet joint,which we feel is not required as per Table UCS-56 Notes 2 ( c ) (2) of ASME Code, even if the service is lethal.please clarify ?
Tube dia is 25.4 mm x 2.11 thk,its a strength weld joint with a Fillet size of 1.5 mm & groove depth of 1.5 mm and light expansion.


Top
 Profile  
 
PostPosted: Thu Jul 07, 2011 6:21 am 
Offline
----------------
----------------

Joined: Tue Dec 01, 2009 1:55 pm
Posts: 270
Location: DESCON Engineering Limited, Pakistan
I believe both tubesheet and tubes are P.No.1 materials. You are true PWHT is not required by Code rules. But if client insists, you can do at extra cost.
If expansion is carried out before welding, WPS would be requalified, see QW-288.

_________________
Thanks & Regards,
Nasir
Welding Engineer
DESCON Engineering Limited.
Lahore, Pakistan.
Mobile # 0092-336-4145402


Top
 Profile  
 
PostPosted: Sun Jul 10, 2011 10:24 am 
Offline

Joined: Wed Jul 06, 2011 3:37 pm
Posts: 2
Thanks Javed for your reply,

These are P.no.1 materials ,and what if the Heat Exchanger is in Sour service.
Also these are TEMA BES,BEU types.

Regards,

Vivek


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO