All times are UTC + 2 hours




Post new topic Reply to topic  [ 3 posts ] 
Author Message
PostPosted: Fri Aug 27, 2010 7:22 am 
Offline

Joined: Fri Aug 27, 2010 7:16 am
Posts: 2
Hi

I need to know sa106 B material heat treatment normalised holding time.

rgds
Mnpr


Top
 Profile  
 
PostPosted: Sun Aug 29, 2010 7:06 am 
Offline
----------------
----------------

Joined: Tue Dec 01, 2009 1:55 pm
Posts: 270
Location: DESCON Engineering Limited, Pakistan
NMPR,

See Section II Part A.
It says SA-106 Pipe may be cold finsihed or hot finished if the size is NPS 1.5 or lower.
If size is over NPS 1.5, then it is a mandatory requirement of Section II part A that pipe shall be hot finished but if purchaser still asks for cold finshed , manufacturer of the pipe can supply clod finished.

further hot finished pipe needs not be heat treated. Cold finished pipes needs be heat treated at or above 650C. The holding time is not given by Section II Part A, it is a good engineering practice that holding time should be 1 to 2 min/mm that means if the nominal thickness is 25 mm, holding time shall be 25 min to 50 min.

Hope it helps a little.

_________________
Thanks & Regards,
Nasir
Welding Engineer
DESCON Engineering Limited.
Lahore, Pakistan.
Mobile # 0092-336-4145402


Top
 Profile  
 
PostPosted: Sun Aug 29, 2010 1:18 pm 
Offline

Joined: Fri Aug 27, 2010 7:16 am
Posts: 2
Thanks a lot nasir.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO