Hi all there!
Case:
Ring flange of 40mm thickness for DN500 manhole is machined from SA-240 304L plate. Ring flange is taken in two or three segments then butt welded together.
question 1:
what kind of testing (D & ND) is to be carried out (mandatory or supplementary)?
question 2:
Is solution annealing required in this case?
Kindly respond urgently.
Thanks.

_________________
Raja Muhammad Iqbal
Senior Design Engineer,
Heavy Mechanical Complex-3,
Taxila.
rajae312@yahoo.com
+923129111977


Top
 Profile  
 
PostPosted: Sat Jan 29, 2011 4:11 pm 
Offline
----------------
----------------

Joined: Tue Dec 01, 2009 1:55 pm
Posts: 270
Location: DESCON Engineering Limited, Pakistan
Requirements of Appendix 20 are not applicable in your case, since it is a ring flange.

Read UHA-108 for the additional fabrication tests required if the vessel is in corrosive service, this para. is applicable to austinitic chromium nickle steel as SA-240-304L is.

PWHT is neither required not prohibited in you case, but if you perform PWHT due to any reason then RT shall be performed after PWHT as per UHA-33(c).

In your case Liquid Penetrant Examination is mandatory requirement as per UHA-33.

if MDMT is -196C and warmer impact test of base metal and HAZ not required otherwise check as per UHA-51.

Full RT is required in your case as per UW-11(a)(2).

I do not see any requirement of solution annealing in your case.
Hope it helps a little.

_________________
Thanks & Regards,
Nasir
Welding Engineer
DESCON Engineering Limited.
Lahore, Pakistan.
Mobile # 0092-336-4145402


Top
 Profile  
 
PostPosted: Wed Feb 02, 2011 6:32 pm 
Offline
----------------
----------------

Joined: Thu Nov 05, 2009 4:11 pm
Posts: 26
Location: Islamabad
Thanx brother for valuable help

_________________
Raja Muhammad Iqbal
Senior Design Engineer,
Heavy Mechanical Complex-3,
Taxila.
rajae312@yahoo.com
+923129111977


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: lsy634 and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO