Dear sir: sorry for my bad english to make you confuse~~ Question is : The boiler proper and boiler external piping(BEP) were fabricated by a same "S" stamp manufacturer. so what kind of data report is required ? see following info. Form P3 and Form P4A is not applicable. Interpretation: I-80-18 Do the rules of Section I, PG-104, require that Boiler External Piping within the scope of Section I and supplied by the boiler Manufacturer, be specifically documented on a P-3 Data Report? Reply: No. The ASME P-3 Data Report Form contains (in Item 11) spaces to record the number, size, and type of nozzle or outlet for four categories of connection to the boiler. These are: (1) steam (2) safety valve (3) blowoff (4) feed Form P-4A, Manufacturer’s Data Report for Fabricated Piping, shall be used to record all shop or field-welded boiler external piping that falls within the scope of this Section but is not furnished by the boiler Manufacturer.
thanks!
|