|
Leem,
The material undertolerance has maybe not been considered in the design. Some piping Codes allow to calculate with the actual thickness, some even with the actual Yield strength. Therefore the 12.5% undertolerance is maybe not available. Also we do not know if Betrandma knows the nominal thickness of the new pipe.
In some counties I have seen piping systems where nobody knew the material, schedule, design code or required thickness. The piping was just there, and the owner wanted to know how to repair it after an explosion.
For this reason, the question shall be more precisely.
DK
|