All times are UTC + 2 hours




Post new topic Reply to topic  [ 3 posts ] 
Author Message
PostPosted: Thu Dec 09, 2010 1:41 pm 
Offline
----------------
----------------

Joined: Wed May 21, 2008 10:52 am
Posts: 20
I need your advice. We are procuring a Pressure Vessel from our Vendor having Sec VIII Div-2 code. Div-2 ask for UDS. We have reviewed the content of UDS (in cl 2.2.2 of ASME VIII Div-2) but all these information are already provided by us in our Mechanical datasheet/ Material Requisition and other Engineering specification sent to Vendor. In this case, do we need to prepare another separate document (called as UDS, repeating the inputs) or all documents already provided to them may be called as UDS.


Top
 Profile  
 
PostPosted: Sat Dec 11, 2010 9:51 pm 
Offline
----------------
----------------
User avatar

Joined: Sat Dec 15, 2001 1:00 am
Posts: 657
gitsunil wrote:
I need your advice. We are procuring a Pressure Vessel from our Vendor having Sec VIII Div-2 code. Div-2 ask for UDS. We have reviewed the content of UDS (in cl 2.2.2 of ASME VIII Div-2) but all these information are already provided by us in our Mechanical datasheet/ Material Requisition and other Engineering specification sent to Vendor. In this case, do we need to prepare another separate document (called as UDS, repeating the inputs) or all documents already provided to them may be called as UDS.


All these information shall be included in a single document or linked together with a facing page quoting all the documents with page control.
This document is the UDS. The UDS shall be certified by one or more PE (Professional Engineer) as required in Div.2.
Mauro


Top
 Profile  
 
PostPosted: Thu Apr 21, 2011 2:49 pm 
Offline
----------------
----------------

Joined: Mon May 31, 2010 6:56 am
Posts: 54
Location: Gujarat, INDIA
additionally, please note all element of part-2 para. 2.2 shall be addressed in UDS.
also, pl. include following additional point while preparing certificate of compliance of UDS. Add equipment name & tag number in UDS certification.
this would help in future to track record.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO