Welder is qualified in P11A gr.5 material (50 mm thick plate),using F6(GTAW) & F4(SMAW).My question is,

1) He has not welded any process for the period of 9 months,should I use same material & F no & radiography for qualifying him?.

2) He has only welded P1 material using F2 for the period of 6 months,Is he still qualified to weld P11A material?

3) what is the qualification range?.& what are the base materials he can weld?.

_________________
Kareem


Top
 Profile  
 
 Post subject: Re: Welder Qualification P11A gr.5 material
PostPosted: Sun Feb 07, 2010 7:34 pm 
Offline
----------------
----------------

Joined: Thu May 25, 2006 6:51 pm
Posts: 94
Location: Germany
Hi kareem.021181,

have a look to paragraph QW-322.2 “Renewal of Qualification”
Code:
(a) Renewal of qualification expired under QW-322.l(a) may be made for any process by welding a single test coupon of either plate or pipe, of any material, thickness or diameter, in any position, and by testing of that coupon as required by QW-301 and QW-302. A successful test renews the welder or welding operator's previous qualifications for that process for those materials, thicknesses, diameters, positions, and other variables for which he was previously qualified.
Providing the conditions of QW-304 and QW-305 are satisfied, renewal of qualification under QW-322.l(a) may be done on production work.

That means the essential variables for a renewal of a WPQ are:
- the welding process (see Interpretation IX-89-27)
- and the type (manual, machine etc) of process (see Interpretation IX-89-38)
only

Use a weld for the renewal regardless to:
- material (see Interpretation IX-83-154 )
- thickness (see Interpretation IX-86-19, IX-83-154)
- diameter (see Interpretation IX-92-12, IX-83-154)
- position (see Interpretation IX-86-19, IX-83-154)
- goove or corrosion-resistant weld metal overlay (Interpretation IX-92-22, IX-86-50)

1) He has to weld GTAW and SMAW regardless to the F-No. The qualification by visual and mechanical examinations or alternatively by RT is required. RT of a test coupon or at minimum 150 mm length of the first production weld(s) is permissible.

2.) Yes.

3.) The qualification ranges are these for which he was previously qualified.

_________________
Kind regards,
Juergen Fleischfresser


Top
 Profile  
 
 Post subject: Re: Welder Qualification P11A gr.5 material
PostPosted: Tue Feb 23, 2010 6:05 pm 
Offline
----------------
----------------

Joined: Sat Jul 04, 2009 6:28 pm
Posts: 20
Location: India
Thanks joergen

_________________
Kareem


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO