ireuel,
Please be a little more precise. Only Boiler External Piping need be PP stamped only as per Section I & B31.1 if local jurisdiction has adopted both codes as a construction codes. Not the complete piping from boiler need be PP stamped as you did note in your message, only BEP needs. BEP is the piping upto and including the required valve(s) by PG-58 of Section I, this piping is shown by solid lines with solid dot in the figures PG-58.3.1(a), Fig. PG-58.3.1(b), Fig. PG-58.3.1(c), Fig. PG-58.3.2, Fig. 58.3.3.
The piping beyond BEP is known as NBEP (Non-Boiler External Piping), the code for NBEP shall be decided by Client, Local jurisdiction.
Hope it helps.