We have a WPS supported by a PQR test weld which is 1 time PWHTed. There is a repair in ASME U stamp vessel after SR. Can I use the WPS (1 time PWHT) to attend the repair? is there any code violation? Or Is it a 2 time PWHted WPS required for this repair? (Material- CS; vessel service-lethal; No impact requirement)


Top
 Profile  
 
PostPosted: Sat Sep 05, 2009 6:38 pm 
Offline
----------------
----------------
User avatar

Joined: Sat Dec 15, 2001 1:00 am
Posts: 657
qaqcmpm wrote:
We have a WPS supported by a PQR test weld which is 1 time PWHTed. There is a repair in ASME U stamp vessel after SR. Can I use the WPS (1 time PWHT) to attend the repair? is there any code violation? Or Is it a 2 time PWHted WPS required for this repair? (Material- CS; vessel service-lethal; No impact requirement)


No Code violation. Time of (aggregated = no matter if in one or more cycles) is required at least 80% of the total time ONLY when impact tested. If not impact tested, no restriction on number or duration of the PWHT (of the same type, assumed to be 595 - 630 °C). Mauro


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC + 2 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group

phpBB SEO